矿井提升系统振动与行程控制仿真研究  被引量:1

A simulation study on coal mine hoist system's vibration and travel control

在线阅读下载全文

作  者:王平[1] 肖兴明[1] 李帅波[1] 徐波[1] 

机构地区:[1]中国矿业大学机电工程学院,江苏省徐州市221008

出  处:《中国煤炭》2008年第12期75-78,共4页China Coal

摘  要:给出了矿井提升系统振动微分方程和S形曲线算法,并分别在折形速度给定和S形给定下,对提升过程进行仿真,最后对两种仿真结果进行定量比较分析。研究表明,S形速度给定可以大大减小提升中的系统冲击,改善钢丝绳受力情况,提高提升的平稳性,同时还可为提升钢丝绳的选用和提升机运行控制方式的设计与改进提供参考。In this paper, the vibration differential equation and S--shaped curve algorithm for the mine shaft hoist system are presented. The paper simulates the hoisting conditions with and without S--shaped curves, analyses and compares the results quantitatively. Study indicates that impacts on hoisting system decrease and steel wire rope tension reduces with S--shaped curve and the hoisting could become smoother and steadier. This paper also provides references to wire rope selection, design and innovations of hoist travel control.

关 键 词:矿井提升系统 振动 行程控制 S形曲线 

分 类 号:TD532[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象