检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州省环境科学研究设计院,贵州贵阳550002
出 处:《环境科学与管理》2008年第12期181-185,共5页Environmental Science and Management
摘 要:环境影响后评估是《环境影响评价法》的一个重要内容。市政污染控制综合项目在评估方法、重点以及指标体系上与一般项目验收评估存在很大差异。在对贵阳市南明河"三年变清"项目进行环境影响后评估中,选用流域综合整治、水质改善、景观整治建设、管理与教育以及民众满意五个方面14个评价因子,采取赋值打分综合评价的方法,得出可准确反映项目实施后环境质量的实际改善情况以及环境污染控制措施有效性的后评估结论,并为进一步完善污染控制方案等后期的环境管理提供科学依据。Post - assessment for environmental impact is an important part of Environmental Impact Assessment Law. Municipal comprehensive pollution -control projects have great difference in assessment measurement, emphasis and index system from those of common projects. During the post - assessment for environmental impact on the project of "Turning Nanming River into Clear One in three year", we have selected 14 assessment factors in 5 different areas, such as comprehensive improvement of the valley, water quality improvement, construction and renovation of the sights, management and education and populace satisfaction. By adopting the comprehensive assessment method of evaluation marking, we do not only draw the post assessment conclusion which demonstrates actual environment improvement and validity of pollution control after the project implemented, but also lay the scientific foundation of further amelioration of pollution control projects.
分 类 号:X828[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222