机构地区:[1]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065
出 处:《吉林水利》2009年第1期1-3,9,共4页Jilin Water Resources
摘 要:龙开口水电站有泄流量大、主河床狭窄等特点,对于这类工程泄洪消能尤为重要。为了解决水工模型第一试验阶段挑流消能不充分、闸墩出口流态紊乱的问题,进行了溢流坝段的水工单体模型试验,对连续坎、差动坎、窄缝坎以及差动坎和舌形坎、窄缝坎和舌形坎、窄缝坎和连续坎的结合运用等多个挑坎体型进行了冲刷试验,从而选择适用于龙开口水电站这类泄流量大、主河床狭窄电站的溢流堰挑流鼻坎形式。Longkaikou hydropower station has the main characteristics of the riverbed narrow and discharge large, for this type of project energy dissipation is particularly important. In order to solve the hydraulic model tests in the first phase of the trajectory not fully eliminate, the flow of outlet close to the pier disorder, a spillway section of the single hydraulic model tests in the spillway section was carried out, as well as the washed out test such as run ridge, differential ridge, narrow slot ridge, and the tongue-shaped ridge, the combination of the use of flip buckets and others, so after analysis and comparing the overflow flip bucket is chose and applied in Longkaikou hydropower station.
分 类 号:TV732[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.244.116