检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北林业大学土木工程学院,哈尔滨150040 [2]哈尔滨工业大学建筑设计研究院,哈尔滨150006
出 处:《低温建筑技术》2009年第1期85-86,共2页Low Temperature Architecture Technology
摘 要:确定单桩竖向极限承载力一直是桩基础设计的重要问题,本文通过哈尔滨某工程的静压预应力管桩的隔时复压试验,并根据静压桩的单桩竖向极限承载力随时间呈双曲线增长的关系,得到粘性土地区依据沉桩终压力推算单桩竖向极限承载力的估算公式。In pile foundation design, it is always an important problem to define the vertical ultimate beating capacity. The re - pressed tests were done on the jacked - in PHC pipe pile of one project in Harbin, at different time. The hyperbolic relationship of the vertical ultimate bearing capacity and time presented an increasing tendency. Based on the result, an estimating formula was proposed to calculate the vertical ultimate bearing capacity of the pile according to final pressure in cohesive soil area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104