检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔峥[1] 徐啸[1] 佘小建[1] 毛宁[1] 张磊[1]
出 处:《水利水运工程学报》2008年第4期32-38,共7页Hydro-Science and Engineering
基 金:国家自然科学基金资助项目(10272062)
摘 要:宝钢马迹山港扩建卸船码头涨潮时水流与码头前沿存在20°左右夹角,对船舶靠泊有较大影响.通过物理模型试验,比较分析了多个方案的整治效果,结果表明,设置一定长度的导流堤可有效改善扩建卸船码头前水流流态,并推荐东导流堤150m方案.推荐方案实施后,现场水文测量资料分析表明,工程实施后的水流流态与模型试验结果完全一致,明显改善了扩建卸船码头前沿的水流条件,涨潮时水流与码头前沿夹角平均为5°~10°,基本归顺了码头前沿水流.There is a angle of about 20 degrees between the port and the flood flow along the extended Majishan unloading harbor in Bao Steel, which affects the berthing of ships. Based on the physical model experiments of several projects, the diversion dike arranged will improve the tidal current along the unloading harbor, and the project of 150 m-long east-diversion dike is thus suggested. Analysis of the local data measured shows that the flow condition keeps consistent with the result of the physical model after the project, that the angle between the port and the flood flow is 5 - 10 degrees, and that the diversion dike improves the tidal current along the port.
关 键 词:物理模型试验 导流堤 水流流态 马迹山港 卸船码头
分 类 号:TV135.6[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145