隧道管棚超前支护施工技术  被引量:6

Constructing Technology of Tunnel Pipeline Shed Advance Timbering

在线阅读下载全文

作  者:杨力源[1] 殷伟[1] 袁霈龙 

机构地区:[1]长安大学公路学院,陕西西安710064 [2]中交二公局东盟营造工程有限公司,陕西西安710075

出  处:《山东交通学院学报》2008年第4期64-67,共4页Journal of Shandong Jiaotong University

摘  要:根据西直沟1#隧道实际工程特点,选取管棚超前支护技术。依据管棚支护的主要机理以及地形地质和荷载情况,采用扇形管棚布置。根据埋深较大时的简化泰沙基公式计算围岩最大压力,并选取管棚参数,对本隧道的施工提供了理论依据,为以后黄土隧道的施工积累了工程实际经验。According to the practical engineering characteristics of Xizhigou 1# tunnel, the pipeline shed advance timbering technology is adopted. Sector pipeline shed arrangement is used in terms of the main mechanism of pipeline shed timbering, landform, geologic conditions and load. The maximum stress of rocks is calculated with the simplified Terzaghi formula when embedding is relatively deep and pipeline shed coefficient is chosen, which offer the theoretical gists for the tunnel construction and accumulate practical engineering technology for future loess tunnels.

关 键 词:黄土隧道 管棚超前支护 管棚参数 

分 类 号:U455.7[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象