关于大型电厂启动/备用电源直接从系统引接带来的问题及解决方案的研究  被引量:1

Problems in Leading of Startup (Standby) Power Supplied by Power Grid for Large Power Plant and its Solution

在线阅读下载全文

作  者:王沛[1] 王巍 刘鹏 

机构地区:[1]西安供电局,陕西西安710032 [2]大唐户县第二发电厂,陕西户县710302

出  处:《陕西电力》2008年第12期81-84,共4页Shanxi Electric Power

摘  要:近年来,随着高变比变压器的广泛应用,许多大型发电厂的启动/备用电源引接方案改变为由发电厂高压主接线系统带启备变。出于经济性考虑,大唐户县第二发电厂在工程设计中,对于一个半接线的主接线启备变回路采用直接由一个断路器带两个隔离开关跨接两条母线的形式。这种主接线形式给继电保护的配置和运行操作带来一系列新问题。本文重点对这种新的电厂主接线形式进行分析,并对保护配置提出完善方案。With wide application of transformer with high transformation ratio in recent years, the option for startup (standby) power source leading in large power plant is changed to be supplied by high voltage bus bar in power plant. For main wiring, considering economic running, a scheme of a breaker with two disconnecting switches which connects to two bus bars, is adopted. The main wiring torms brings a series of new problems to configuration & operation of relay protection. This paper emphatically analyzes the new main wiring forms for power plant and proposes a perfect scheme for the configuration of the relay protection.

关 键 词:高变比变压器 母线 主接线形式 一个半断路器接线 备用电源 断路器 

分 类 号:TM645[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象