检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西北农林科技大学水利与建筑工程学院,陕西杨凌712100
出 处:《水利与建筑工程学报》2009年第1期68-70,共3页Journal of Water Resources and Architectural Engineering
摘 要:洞河水库大坝为碾压混凝土双曲拱坝,最大坝高65.5 m,采用"三表+二底"泄洪方案。通过1∶50的水工整体模型对其表孔泄洪消能布置进行了体型优化试验研究,提出了差动式鼻坎与斜切圆柱体鼻坎巧妙结合,合理搭配,使其下泄水流实现纵、横向充分扩散,最大限度地增加落水面积,充分利用下游河道水体消能减弱对下游河道的冲刷作用,从而较好地解决了该工程消能防冲问题。该泄洪方案已被设计单位采用。The dam of Donghe Reservoir is a roller compacted concrete double-curvature arch dam with the maximum height of 65.5 m. The method of "3 upper holes + 2 bottom outlets" is used for flood discharge. Through the integral hydraulic model with scale of 1 : 50, the layout of energy dissipation of flood discharge for its upper holes is tested and studied in optimization of its form, and the pattern combining the differential bucket with the chamfered cylinder bucket is put forward, thereby to make the discharged water flow spreading fully in longitudinal and transverse direction, in order to increase the falling water area to the utmost extent, reduce the scouring by using the water in lower reach for energy dissipation and solve the problems of energy dissipation and erosion eontrol of the project.
分 类 号:TV652.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28