内置渗透墙型生态塘处理农村生活污水的研究  被引量:4

Study on Built-in Permeable Barrier of Ecological Pond for rural Sewage Treatment

在线阅读下载全文

作  者:翟鸿飞[1] 邹仲勋[1] 杜华明 

机构地区:[1]华北水利水电学院环境与市政学院,河南郑州450011 [2]河南省水文地质工程地质勘察院,河南郑州450011

出  处:《环境科学与管理》2009年第1期89-92,共4页Environmental Science and Management

摘  要:通过在传统的生态塘中增设了一道活性渗透墙而改造成的内置渗透墙型生态塘。结果表明,内置渗透墙型生态塘对生活污水具有良好的处理效果,在水力负荷为0.05~0.1 m3/m2.d之间时,即水力停留时间在10 d^20 d时,它对COD的去除率在60%以上,对TN的去除率在50%以上,对TP的去除率在75%以上。大大减轻了后序工艺的负担,减少了后序处理设施。从而缩小了整个生态塘系统的占地面积,节省了基建投资,是一种高效的适合农村生活污水处理的技术。A new built - in permeable reactive barrier of ecological pond was built through add a wall of a permeable reactive barrier into traditional ecological pond. The results showed that built - in permeable reactive barrier of ecological pond can reach a good effect for sewage treatment, when the hydraulic loading is between 0.05 and 0.1 m^3/m^2 . d, hydraulic retention time is 10 d - 20 d, the COD removal efficiency is better than 70%, TN removal efficiency is better than 50%, TP removal efficiency is better than 75%. It Reducs the burden largely for follow - up technique and follow - up treatment facilities. Thereby it will reduce the area of entire eco - system and save infrastructure investment, it is a highly effective treatment technology for rural sewage.

关 键 词:渗透墙 生态塘 农村生活污水 

分 类 号:X703.3[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象