检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]太原理工大学建筑与土木工程学院,山西太原030024 [2]中北大学土木工程系,山西太原030051
出 处:《中国农村水利水电》2009年第1期52-54,58,共4页China Rural Water and Hydropower
基 金:山西省自然科学基金项目资助(2008011055)
摘 要:桩基承载力的确定与计算其所需的地基土层土工参数和原位测试参数关系密切,规范中只给出了取值原则,不涉及具体的方法。在此,以太原某工程桩基设计为研究对象,立足该场地工程地质条件,选择合适的土工参数,对卵石土地基桩侧摩阻力标准值取值进行了讨论和分析,进而预估了桩的抗拔承载力,并利用抗拔静载试验验证了预估结果的正确性,从而缩短了工期,降低了成本。The bearing capacity of piles is close to the geotechnical parameters or in-situ testing parameters of strata. However, only rule of value determination is provided in code, which has nothing to do with specific methods. Therefore, a pile design project in Taiyuan is selected to study this problem. Combining with the engineering geological conditions and choosing various geotechnical parameters, nominal values of side friction and the tension capacity of the pile are discussed and estimated in pebble foundations. The estimated values are reasonable and correct by the static loading test. The time limit of the project is shortened and the construction cost is reduced.
分 类 号:O319.56[理学—一般力学与力学基础]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15