检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学三峡库区地质灾害教育部重点实验室,湖北宜昌443002
出 处:《工程勘察》2009年第2期46-49,共4页Geotechnical Investigation & Surveying
基 金:水利部科技创新项目基金资助(SCX2001-12)
摘 要:讨论了同马大堤堤身土质状况,对同马大堤堤基土层结构进行了分类,通过渗流计算提出了同马大堤典型断面堤基防渗处理措施。针对同马大堤堤基土层结构的特点,提出了堤基防渗处理的原则。堤防防渗方案的选择,必须顾及堤基土体的物理力学性质及堤基周围的人文及地理环境要素,同时应考虑到用于堤防防渗处理的经费,然后通过多种方案的比较,找出其中最为合理的堤防防渗处理措施。Soil conditions of the dike body at Tongma main dike is discussed, and the structure of the soil layer of the dike foundation at Tongma main dike is classified. The measure to prevent seepage to the dike foundation of the typical segment at Tongma main dike is given by means of seepage calculation. Considering the characteristics of the structure of the soil layer at Tongma main dike, the principles to prevent seepage to the dike foundation at Tongma main dike are given. To choose methods to prevent seepage of the dike, the physical and mechanical property of soil of the dike foundation and cultural and geographical environment factors around the dike foundation must be considered, and the funds to prevent seepage to the dike must be considered, the appropriate measures to prevent seepage to the dike is decided by means of comparison of many methods.
分 类 号:TV871[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222