检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:白云峰[1] 崔一尘[2] 汪洋[2] 吴树志[2] 高翔[1] 骆仲泱 岑可法[1]
机构地区:[1]浙江大学能源清洁利用国家重点实验室,浙江杭州310027 [2]北京博奇电力科技有限公司,北京100022
出 处:《热力发电》2009年第1期14-18,共5页Thermal Power Generation
摘 要:湿法烟气脱硫(WFGD)的双入口吸收塔烟道布置方案与传统单入口吸收塔布置方案相比,具有能耗低、占地面积小的优点。以某电厂660 MW燃煤机组为例,对双入口和单入口吸收塔的烟气流场分别进行数值模拟。结果表明,双入口吸收塔烟道布置方式入口不易积垢、流场均匀度好,是一种更为优越的湿法烟气脱硫系统的设计方案。Compared with traditional layout scheme of the absorption tower with single inlet, the flue duet layout scheme of absorption tower with double inlets for wet flue gas desulphurization (WFGD)boasts the aduantages of low energy consumption and small area of occupation. Taking 660 MW coal- fired unit as example,the numerical simulation of flue gas flow field in the absorption tower with double inlets and single inlet has been carried out respectively. Results show that the flue duct layout scheme of absorption tower with double inlets isn't easy to make fouling in the entrance, and the uniformity of flow field is also good, being a more advantageous design scheme for WFGD
关 键 词:660MW机组 湿法烟气脱硫 吸收塔 双入口 烟气流场 数值模拟
分 类 号:TM628[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3