检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖北民族学院信息工程学院电气工程系,湖北恩施445000 [2]华中科技大学电气与电子工程学院,湖北武汉430074 [3]中国国电集团财务公司,北京100034 [4]上海电力学院,上海200090
出 处:《华东电力》2008年第12期43-46,共4页East China Electric Power
摘 要:提高大规模互联电网区域间的输送能力不仅可以满足电力负荷增长的需求,而且可以优化资源分布,节约输电走廊。介绍了提高互联电网输送能力的方法,归纳和分析了提高互联电网输送能力的技术措施,结合华东电网的实际数据,采用BPA程序对几种典型的提高线路输送功率的技术措施进行了仿真计算,并对计算结果进行了分析和比较。Improvement of the cross-regional transmission capacity of large interconnected grids can not only meet the requirements of load growith, but also optimize resource distribution and save transmission corridors. Methods to improve the transmission capacity of interconnected grids are recommended, and relevant technical measures are summarized. The practical data of East China Power Grid were used in simulation of several typical technical measures by using BPA program. The calculation results are analyzed and compared.
关 键 词:互联电网 输送能力 特高压 灵活交流输电 紧凑型输电
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222