舾装码头工程对大辽河口流场的影响  被引量:3

Effect of outfitting quay project on tidal current at Daliaohe Estuary

在线阅读下载全文

作  者:刘哲[1] 魏文礼[2] 冯小香[1] 孔宪卫[1] 

机构地区:[1]交通部天津水运工程科学研究所工程泥沙交通行业重点实验室,天津300456 [2]西安理工大学水利水电学院,西安710048

出  处:《水道港口》2008年第6期394-400,共7页Journal of Waterway and Harbor

摘  要:建立大辽河口二维潮流数学模型,分别对工程建设前后潮流场进行模拟计算。计算结果显示,由于舾装码头及引堤工程缩窄了盖州滩东侧至双台子河口的主流通道,使得周围海区的水动力环境发生了一定变化,受工程影响工程区西侧(双台子河口一侧)流速增大,工程区东侧(大辽河口一侧)西水道入口处流速受围填二期影响略有减弱,东水道基本不受工程影响。Based on establishing two- dimensional mathematical model of tidal current at Daliaohe Estuary, tidal current field before and after construction was simulated and analyzed. The results show that the mainstream channel form east side of Gaizhou Beach to Shuangtaizi Estuary is narrowed by outfitting quay and seawall projects, then the hydrodynamic environment is changed around the coastal seas. Influenced by the project, velocity of flow at the west side (nearby Shuangtaizi Estuary) is increased, while the velocity at west course entry of the east side (nearby Daliaohe Estuary) is decreased after reclamation. East course is not influenced by the project.

关 键 词:舾装码头 潮流泥沙 数值模拟 大辽河 

分 类 号:TV142[水利工程—水力学及河流动力学] O742.1[理学—晶体学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象