检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第一航务工程勘察设计院,天津300222
出 处:《水运工程》2009年第1期23-29,共7页Port & Waterway Engineering
摘 要:根据长江口深水航道治理工程北导堤堤头部位2.6km长软基段的工程条件,开发了一种新型的空心方块斜坡堤结构。这种新型结构的基本构思是利用各空心方块之间以及空心方块本身的两个空隙率,降低堤身单位体积的重量以及堤身断面总重量,从而满足软土地基的承载力和整体稳定的要求。对空心方块斜坡堤的设计、试验研究以及工程实施效果等作概要介绍。A new structure type of hollow-block mound breakwater was developed according to the soft soil conditions of a 2.6 km long jetty segment close to the head of the north estuary jetty of the deepwater channel regulation project at the Yangtze Estuary. The basic conception of this new structure is to utilize the porosity among the hollow blocks as well as the voids inside the blocks to reduce the unit and total weight of the mound, so as to satisfy the requirements of the bearing capacity and the stability of soft soil foundation. The design, experimental study and effect of engineering execution of the hollow-block mound breakwater are outlined in the paper.
分 类 号:U656.313[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12