检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国市政工程》2008年第B12期25-26,共2页China Municipal Engineering
摘 要:上海闵浦二桥为独塔双索面钢板桁组合梁斜拉桥。主塔顺桥向为单柱式,横桥向为H型结构。介绍了主塔设计布置,根据恒载、活载、温度影响及风力荷载,进行了顺桥向静力分析;针对主塔施工阶段,施工完毕阶段和成桥阶段的不同工况,分析了横桥向受力情况,介绍了克服塔柱倾斜而产生的自重弯矩以及横梁再现裂缝的主塔施工方式。Minpu Bridge 2 in Shanghai is a cable-stayed bridge with the steel plate-truss composite girder, a single pylon and double cable planes. The main pylon is of the single column type along the bridge and the H-formed structure across the bridge. Introduced hereby is the pylon design. A . static analysis is made longitudinally based on the dead load, active load, temperature impact and wind load. The force across the bridge is also analyzed in the stages of construction and completion of the pylon and when the bridge is finished, including the ways of construction to overcome the self-weight bending moment and the transverse cracks in the cross beam generated from the slanted pylon column.
分 类 号:U448.273.38[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43