检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱叔平[1]
出 处:《建筑技术》1998年第3期181-182,共2页Architecture Technology
摘 要:高水位地区深基础施工中由于停电、排水系统故障、总体降水能力不足等原因,会在雨季施工中造成基础上浮,处理费用高。可通过抗浮稳定计算并采取包括注水等稳定措施解决。During construction of deep foundation work in underground of high water level region,there are often some accidental events occured in raing season construction such as shortage of electricity, accident of drainage system,and insufficiency of dewatering capacity etc,and eventually, that would cause the floating of its deep foundation.Of course, its antifloating treatment would be very costly. This could be avoided if stability measures including anti-floating calculation and anti-floating watering method were duly adopted.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229