检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏焕卫[1,2] 贾强[1] 孙剑平[1] 田洪水[1]
机构地区:[1]山东建筑大学工程鉴定加固研究所,济南250014 [2]同济大学地下建筑与工程系,上海200092
出 处:《建筑技术》2009年第2期147-150,共4页Architecture Technology
基 金:建设部科技攻关计划(2008-K2-30);山东省科技攻关计划(2007GG2006005)
摘 要:齐鲁石化公司热电厂卸煤设施基坑距运行铁路很近,局部深达20m,上部土层较差而底部土层较好,经多方案比较,基于安全、经济、合理的原则,决定采用复合土钉边坡支护方案,该方案利用了复合土钉墙的超前支护作用,监测结果表明有较好的安全性和经济性。In Thermal Power Plant under Qilu Petrochemical Company, foundation pit of coal discharging facilities is close to the railway and local depth of the foundation pit is as deep as 20 m. In the foundation pit, soil on upper layer is better than that on lower layer. After comparison among different schemes on safe, economical and rational principles, pre-supported effect of compound soil-nailing side slope supporting scheme is adopted, and monitoring results show that this construction method has high safety and economical efficiency.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222