检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王兴奎[1] 方红卫[1] 王桂仙[1] 陈稚聪[1]
机构地区:[1]清华大学水利水电工程系
出 处:《清华大学学报(自然科学版)》1998年第1期55-58,共4页Journal of Tsinghua University(Science and Technology)
基 金:国家自然科学基金
摘 要:试验研究了三峡枢纽运行初期坝上游的通航条件。在枢纽运行32年之内,坝上游修660m短堤的引航道即能满足通航要求。在运行20年之内泥沙淤积不会影响船闸侧向取水,20年之后则需在取水口附近适时清淤。对坝区来沙量变化、淤积过程、挟沙能力及浓度分布等参数进行了分析。研究结果表明,大包隔流堤可以在30年以后修建。The navigation condition of the upstream of Three Gorges Project Dam was experimentally studied for the initial period in this paper. In the period of the project operated for 32 years, the flow condition could satisfy the navigation demands only need to build 660 m short separating dike. The sediment deposition has no influence on the intake water of the ship lock within 20 years. After the project operated for 20 years, some draining sediment measures ought to be taken to guarantee the intake water. Some basic factors were analyzed such as the sediment amount coming into the dam area, the process of sediment deposition, the transport capacity of suspend load and the concentration distribution. The separating dike including the shiplift channel could be built after 32 years of the project operation.
分 类 号:U612.1[交通运输工程—船舶及航道工程] TV61[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229