检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]铜川煤矿建筑安装工程公司,陕西铜川727000 [2]中国矿业大学,江苏徐州221116
出 处:《施工技术》2009年第1期99-101,共3页Construction Technology
摘 要:玉华煤矿大直径原煤缓冲仓仓壁采用滑模系统施工。以三角桁架和压力环作为主体受力结构操作平台,解决了操作平台直径大引起的刚度不足问题。L形支撑保证了模板提升过程中的稳定性。对原煤筒仓仓壁混凝土分组、分区域、分层浇注,解决了混凝土浇注区段过长引起的温度应力问题。实践证明,该法施工速度快、机械化程度高、经济效益明显。This paper introduces slipform construction of large diameter raw-coal buffer silo wall in Yuhua Coal Mine. Triangle truss and pressure circle are designed as main beating structure to increase rigidity of large diameter operation platform. L-shaped supporting keeps stability of platform during formwork lifting. Temperature stress induced by long pouring section is prevented by pouting concrete in different groups, areas and layers. It proves that the mentioned methods have advantages of fast construction speed, high mechanization degree and obvious economical effect.
分 类 号:TU249.3[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3