检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国煤炭地质总局水文地质局第四水文地质队,河北邯郸056001
出 处:《中国煤炭地质》2009年第1期65-66,70,共3页Coal Geology of China
摘 要:瓦斯抽放孔要求井斜小,孔径大,下入的井管重量大。以实例介绍了使用GZ-2000型钻机在某煤矿瓦斯抽放站成功施工深400m,直径Ф690mm瓦斯抽放井的施工工艺。在施工过程中采用Ф216mm牙轮钻头+满眼钻具和钟摆钻具施工先导井眼,再采用Ф410mm、Ф690mm组合牙轮钻头+塔式钻具分级扩眼,使用电子多点测斜仪及时监测井斜变化,用钟摆钻具组合进行纠斜,在Ф426mm管体上设置三组镶焊合金的肋骨条做成圆井器来进行圆井,在管体底部设置浮力阀,合理掏空以减少井管重量,确保了工程质量。Small well deviation, large diameter and heavy well type lowering are required by the gas drainage wells. Examples introduced gas drainage well construction technology by the use of GZ-2000 drill rig drilled a 400m depth, φ690mm for a coalmine gas drainage station. During construction, a pilot well drilled by φ216mm roller bit, packed hole assembly and pendulum assembly, then φ410mm, φ690mm assembled roller bits and tapered drill string reaming in tandem. Well deviation is monitored by multipoint electronic inclinometer; hole straightening by pendulum assembly; well rounded out by a rounder made of φ426mm pipe set on three sets of carbide ribs; a buoyant valve has set on the bottom of the pipe and reasonable hollow out to reduce pipe weight thus ensure to construction quality.
分 类 号:P634.5[天文地球—地质矿产勘探] TD712.62[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145