检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力试验研究院有限公司,上海200437 [2]华东天荒坪抽水蓄能有限责任公司,浙江安吉313302 [3]华东电力调度中心,上海200002
出 处:《华东电力》2009年第1期120-124,共5页East China Electric Power
摘 要:对华东电网抽水蓄能机组一次调频试验和研究工作进行了详细阐述,提出了切合抽水蓄能特点的一次调频试验新方法,介绍了一次调频参数优化情况,根据对不同类型机组一次调频性能指标的对比分析,总结出抽水蓄能一次调频的特点,并对抽水蓄能一次调频考核指标进行了探讨。The primary frequency regulation (PFR) test for pumped-storage units in East China Power Grid as well as related research was presented in details, and a new PFR test scheme suitable for pumped-storage units was introduced, including the parameter tuning. Based on the comparative analysis regarding PFR performance of different type units, the PFR characteristics of pumped-storage units were summarized, and discussion on PFR performance criteria for pumped-storage units was also provided.
关 键 词:一次调频 抽水蓄能机组 一次调频试验方法 考核标准 参数优化
分 类 号:TK323[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145