检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《地下空间与工程学报》2009年第1期163-168,共6页Chinese Journal of Underground Space and Engineering
摘 要:以北京某在建地铁工程为例,运用FLAC软件对分离岛式地铁车站通过邻近桥桩整个施工过程进行模拟,分析了两种不同施工方案即桥桩加固方案和未加固方案时车站施工对于桥桩附近地面沉降、桥桩弯矩及轴力等参数的影响。研究结果表明,桥桩加固方案有效地控制了桥桩附近土体沉降,效果优于未加固方案,但车站结构的拱顶沉降由于围护结构加固的不对称设计,桥桩加固方案下要大于未加固方案。Taking a subway project under construction in Beijing as an example, FLAC software was utilized to simulate the whole construction process of separated island form metro station passing by the adjacent bridge piles, and the impacts of the ground settlement nearby the piles, the moment and axial force of piles on the station construction under two different construction schemes, namely the scheme with reinforced piles and that with unreinforced ones were analyzed. The researeh result indicates that the reinforced piles scheme could decrease the settlement of the metro station's vault, and control the ground settlement nearby the piles effectively, and the effect is superior to the latter scheme.
关 键 词:分离岛式车站 桥桩 复合式锚杆桩 地铁 FLAC
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7