检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田科军
机构地区:[1]中铁十一局集团城市轨道工程有限公司,武汉430071
出 处:《铁道建筑技术》2009年第1期51-53,64,共4页Railway Construction Technology
摘 要:针对盾构机过江施工中洞穿河堤,江底地质条件复杂,易出现喷涌现象,地层软硬不均,刀具磨损大等难度大、技术新、风险系数高等重难点问题,提出了盾构机类型的经济比选,给出了江底施工掘进参数和施工中出现的主要问题及解决的措施方法。There are some important and difficuh questions in EPB shield machine crossing river, such as perforating em- bankment, complicated geographical conditions at the bottom of the river, easy water spewing, combination of soft and hard stratum, tool wearing. Targeting at these difficult, new-tech and high-risk problems, this paper proposes an economical comparison for different EPB shield machine, tunneling coefficient for river bottom construction, as well as the main problems and solutions in construction.
分 类 号:U445.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7