土压平衡盾构机穿越珠江施工重难点分析  被引量:3

Analysis on the Construction Importance and Difficulties of EPB Shield Machine crossing Zhujiang

在线阅读下载全文

作  者:田科军 

机构地区:[1]中铁十一局集团城市轨道工程有限公司,武汉430071

出  处:《铁道建筑技术》2009年第1期51-53,64,共4页Railway Construction Technology

摘  要:针对盾构机过江施工中洞穿河堤,江底地质条件复杂,易出现喷涌现象,地层软硬不均,刀具磨损大等难度大、技术新、风险系数高等重难点问题,提出了盾构机类型的经济比选,给出了江底施工掘进参数和施工中出现的主要问题及解决的措施方法。There are some important and difficuh questions in EPB shield machine crossing river, such as perforating em- bankment, complicated geographical conditions at the bottom of the river, easy water spewing, combination of soft and hard stratum, tool wearing. Targeting at these difficult, new-tech and high-risk problems, this paper proposes an economical comparison for different EPB shield machine, tunneling coefficient for river bottom construction, as well as the main problems and solutions in construction.

关 键 词:城市地铁 土压平衡盾构机 掘进参数 

分 类 号:U445.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象