CFG桩施工产生环境问题的机理分析及应对措施  被引量:5

Mechanism Analysis on Environmental Problems Caused by CFG Pile Construction and the Countermeasures

在线阅读下载全文

作  者:孙瑞民[1] 杨凤灵[1] 邓小涛[2] 

机构地区:[1]华北水利水电学院,河南郑州450011 [2]中国石油天然气管道工程有限公司,广东珠海509015

出  处:《探矿工程(岩土钻掘工程)》2009年第2期24-28,共5页Exploration Engineering:Rock & Soil Drilling and Tunneling

基  金:河南省科技攻关项目"长螺旋钻管内泵压CFG桩复合地基技术在饱和粉土中的适应性研究"(编号:0524450008)

摘  要:根据多年施工经验,长螺旋钻管内泵压CFG桩施工技术应用到郑州地区饱和粉土等软土层时,常出现桩周地面沉降、周边建筑物和路面开裂以及管道错位等环境问题。通过对长螺旋钻管内泵压CFG桩施工引起环境问题的机理进行综合分析,提出相应措施,并对长螺旋钻管内泵压CFG桩在饱和粉土等软土层中的适应性作出评价。According to the years construction experience, when the technology of pump pressure CFG pile in continuous auger drilling pipe is applied in the stratum of saturated clay in Zhengzhou area, a series of environmental problems would come forth, such as ground settlement around piles and adjacent buildings, pavement cracking and pipeline dislocation. By the comprehensive study on the mechanism ofenvironmental problems caused by construction of pump pressure CFG pile in continuous auger drilling pipe, the countermeasures are put forward, and the adaptability evaluation on this technology in saturated silty soil is made.

关 键 词:CFG桩 长螺旋钻管内泵压施工 环境问题 机理分析 应对措施 适应性评价 

分 类 号:TU472[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象