检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质大学地球物理与空间信息学院,武汉430074 [2]河南省煤田地质局物探测量队,郑州450009 [3]河南省豫中地质勘察工程公司,郑州450053
出 处:《工程地球物理学报》2009年第1期115-118,共4页Chinese Journal of Engineering Geophysics
摘 要:通过对全三维地震勘探方法的研究,结合采区勘探成果,从点、线、面、体等多渠道及三维数据体的多个侧面,全方位剖析三维数据体,使解释人员从传统的剖面解释模式中彻底解放出来,直接面对地质异常体进行三维立体解释,从而对采区滑动构造的位置及形态进行精细地分析与研究,避免了地震解释的随意性,大大提高了解释的精度及效率。By the research of the full 3--D seismic method, combined with the result of area interpretation, the 3--D data volume is analyzed from all the aspects from point, line, plane and so on. Thus the interpreting staffs can be completely liberated from the traditional sectional interpretation and they can be directly faced with the interpretation of the geological abnormity. In this way, it can avoid interpreting it haphazardly so as to improve our interpretation more precisely and efficiently.
分 类 号:P631.4[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117