作 者:邝伟[1] 陈建斌[1] 江建忠[2] 袁杰[3] 谢泽良
机构地区:[1]四川白马循环流化床示范电站有限责任公司,四川内江641005 [2]西安热工研究院有限公司,陕西西安710032 [3]四川省电力工业调整试验所,四川成都610072
出 处:《热力发电》2009年第2期45-47,58,共4页Thermal Power Generation
摘 要:四川白马循环流化床示范电站300 MW CFB锅炉飞灰气力输送系统存在管道堵塞、前后电场出力无备用和阀门频繁损坏等问题,对此,提出了改变省煤器与一电场连接方式,增大飞灰气力输送管管径,在进气阀和逆止阀之间加装"n"型连通管,将透气阀和气囊式圆顶阀更换为陶瓷双面闸板阀等改进措施。改造后,系统出力显著提高,运行可靠性明显增加,效果良好。The problems existing in pneumatic ash conveying system of 300 MW boiler in Sichuan Baima CFB Demonstration Power Station Co I.td are Pipe blockage,without reserve output capacity in front and rear electric fields,and frequent damage of valves etc.. For these,corresponding retrofit measures, such as increasing the diameter of conveying pipe, changing the connection scheme of econ- omizer with one electric field,and additionally installing n - shaped connection tube between the air inlet valve and the non - return valve,as well as replacing the air - intaking valve and the air - bag type domed valve with ceramie double - sided gare valve,etc. ,have been put forward. After retrofitting,the output capacity of said conveying system has been remarkably enhanced,the reliability of operation being subsantially increased, having good effectiveness.
关 键 词:循环流化床锅炉 气力除灰系统 管道阀门 输送系统
分 类 号:TK229[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15