宽尾墩消力池池长对消能效果影响的试验研究  被引量:2

Test and Study of Influence of Length of a Flaring Pier Plunge Pool on Energy Dissipating Effect

在线阅读下载全文

作  者:邓懿[1] 杨具瑞[1] 田振华[1] 罗晶[1] 兰观福[1] 

机构地区:[1]昆明理工大学电力工程学院,云南昆明650051

出  处:《云南水力发电》2009年第1期11-14,共4页Yunnan Water Power

摘  要:基于宽尾墩消力池泄洪消能的水工模型实验,在不同泄流量、闸门开度和下游水深的条件下,研究不同池长消力池的泄洪流态、流速分布、消能率以及消力池底板压力等水力特性,比较了不同池长消力池的消能效果。试验证明:在尺寸相对较长的消力池中,可达到较好的消能效果。This paper makes a study of such hydraulic characteristics as flow pattern of flood discharging, distribution of flow velocity, rate of energy dissipation and bottom plate pressure of a plunge pool with different lengths under different flood discharges, gate openings and downstream water depths based on hydraulic model test for flood release and energy dissipation of a flaring pier plunge pool and then makes a comparison between the plunge pools with different lengths in terms of energy dissipation effect. The test has proved that a longer plunge pool can bring about better energy dissipation effect.

关 键 词:宽尾墩 消力池 水力特性 试验研究 

分 类 号:TV653.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象