检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]提高油气采收率教育部重点实验室大庆石油学院,黑龙江大庆163318 [2]中油新疆油田公司,新疆克拉玛依834000
出 处:《特种油气藏》2009年第1期61-63,67,共4页Special Oil & Gas Reservoirs
摘 要:在分析周期注采机理的基础上,为进一步激活剩余油,建立注水井全井同步周期注水、注水井井间交替注水、注水井与采油井同时井间交替注采3种周期注采方案。采用数值模拟方法对这3种方案进行了优选,以确定适合周期注采开发的油藏地质条件、实施周期注采的最优半周期。在模拟过程中,考虑了周期注采时机、地层渗透率、厚度对开发效果的影响。研究结果表明,注水井与采油井同时井间交替注采方案为最优方案;周期注采方案适合在含水率大于60%、渗透率大于400×10-3μm2、厚度大于2m的油层中实施。在此基础上,根据地层压力、含水和注采半周期对采收率的影响进行研究,给出周期注采最优半周期与地层压力、含水级别的关系。研究结果对中高含水期周期注采方案的制定和和实施具有一定指导意义。Cyclic injection-production mechanism is analyzed for further activation of remaining oil. Three cyclic injection-production programs are established, including entire well cyclic injection, interwell alternative injection, and alternative injection-production between injectors and producers. The 3 programs are optimized by numerical simulation to identify suitable geological conditions and optimal half cycle for performing cyclic injection-production. The impacts of cyclic injection-production time, formation permeability and thickness on development response are considered during simulation process. The result shows that alternative injection-production between injectors and producers is the optimal program; cyclic injection-production is suitable for reservoirs with water cut over 60%, permeability over 400 × 10-3μm2 and thickness over 2 m. The influences of formation pressure, water cut and half cycle on recovery factor are studied, and the relationship between the optimal half cycle and the level of formation pressure and water cut is understood. This study is of reference significance to preparation and implementation of cyclic injection-production program in medium-high water cut stage.
关 键 词:中高含水期 周期注采 数值模拟 方案优选 流度场
分 类 号:TE319[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.209.210