南阳湖斜拉桥成桥及施工阶段索力优化的研究  

Research on Cable Force Optimum in Construction of Nanyanghu Cable-stayed Bridge

在线阅读下载全文

作  者:卢萍[1] 王永岩[1] 刘旭光[2] 

机构地区:[1]辽宁工程技术大学力学与工程学院,辽宁阜新123000 [2]东北大学资源与土木工程学院,沈阳110004

出  处:《煤炭技术》2009年第3期103-106,共4页Coal Technology

摘  要:以沈阳市在建的南阳湖斜拉桥为工程背景,采用MIDAS/Civil软件进行有限元分析,实现了对斜拉桥成桥阶段和施工阶段索力的模拟计算。确定了一种综合方法得到合理的南阳湖桥成桥索力。应用正装分析方法对各施工工况进行了仿真,绘制出施工阶段的索力时程曲线,用于该桥整个施工控制过程。On the basis of Shenyang N anyanghu Cable - stayed Bridge which is being builded, a simulativecomputation is realized for finished-dead state and construction state , through the fini(e element analysis software MIDAS/Civil. The reasonable cable force of Nanyanghu Cable - stayed Bridge in the finished dead state by a comprehensive method is determined. Each construction stage is simulated by the forward analysis meth-od, and then the cable force time travel curve of the construction stage is drawed, in order to control the whole construction process.

关 键 词:斜拉桥 索力优化 成桥状态 时程曲线 

分 类 号:U44[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象