检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴洁[1]
机构地区:[1]黄石理工学院土木建筑工程学院,湖北黄石435003
出 处:《建筑技术》2009年第3期253-254,共2页Architecture Technology
摘 要:以武汉商业服务学院体育馆预应力框架和柱预应力混凝土施工为例,着重介绍了该工程预应力梁跨度大、预应力筋单孔束数多且长、张拉用千斤顶吨位大、预应力柱及部分预应力梁为变角度张拉和张拉端节点复杂等施工难点的解决措施,为后张有粘结预应力混凝土施工提供了参考。Prestressed concrete frame and column construction of Wuhan Commercial Service College Gym- nasium is taken as an example herein to introduce measures that are adopted to solve construction difficulties in details, such as large span of prestressed beam, many long prestressed steel single pore bundle, high tonnage of prestressing hoisting jack, variable prestressing angle of prestressed column and partial prestressed beam and complex prestressing end nodes, providing references for post-tensioning bonded prestressed concrete construction.
分 类 号:TU756[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28