检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建筑结构》2009年第2期58-60,共3页Building Structure
摘 要:为了研究压桩和托桩下的摩阻力相关关系,在广东佛山某公路桥梁桩基的同一根钻孔灌注桩上分别进行了自平衡静载试验(模拟托桩加载)以及传统静载原位试验(模拟压桩加载),对桩侧摩阻力、荷载-位移曲线等进行了比较,结果表明托桩加载的平均摩阻力为压桩加载的0.72倍,可为类似工程提供参考。To research the relationship between friction resistance of top-loaded pile and that of down-loaded pile, self-balanced load test (to simulate down-loaded pile) and traditional static load test (to simulate top-loaded pile) were conducted on the same pile of a highway bridge in Foshan, Guangdong. On the basis of test results, the friction resistance of pile and curve of load versus displacement were compared. The ratio of friction resistance of down-loaded pile to that of top-loaded pile is 0.72, which can provides reference for other related projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.31.104