机构地区:[1]中国水电顾问集团西北勘测设计研究院,陕西西安710065 [2]西安理工大学,陕西西安710048
出 处:《水力发电》2009年第1期67-70,共4页Water Power
摘 要:炳灵水电站在国内首创将水库的泄洪溢流明渠修建在厂房顶部的布置方式。电站水轮发电机组轴承设计特点为负荷大、转速低,为低速重载轴承,因而轴承润滑系统的合理设计和布置是机组的安全稳定运行的重要保证。对当前国内大型贯流机组普遍采用的几种润滑方式进行分析,结合炳灵水电站厂房布置的特点,优化设计,选用了适合本电站的轴承润滑方式。An optimum design that floodway is built on the top of powerhouse is created in the Bingling hydropower station .It has 5 sets of 48MW bulb-type unit, with maximum operation 25.7 meter and turbine runner diameter 6.2 meter. Large_load and low_speed is the characteristic of bearing of the Bingling hydropower so that the unit bearing lubrication system design and layout is a key guarantee for the safe and stable operation .This paper analyze the different kinds of bearing lubrication solution normally used for large capacity bulb-type unit. A new suitable bearing lubrication system is accepted according to the powerhouse arrangement.
分 类 号:TK414.11[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.61