机构地区:[1]中国水电顾问集团西北勘测设计研究院,陕西西安710065
出 处:《水力发电》2009年第1期71-74,共4页Water Power
摘 要:炳灵水电站采用了贯流机组厂顶过流式布置,泄洪表孔与厂房重叠布置,泄洪表孔工作闸门启闭机采用了顶升柱塞式液压启闭机,布置独特。该电站金属结构闸门、启闭机布置及设计吸收了国外同类型工程的设计经验,结合本工程特点和运行要求,布置紧凑、结构合理、设备运行良好,可供同类工程设计参考。The Bingling Hydropower Station adopted the tubular turbine and the arrangement of the floodway to be built on the top of powerhouse. The flood-releasing surface hole is arranged on the top of powerhouse. The gate hoist of flood- releasing surface hole adopted top lifting piston hydraulic hoist. The arrangement is very unique. The layout and design of metal structure gate and hoist of the Station absorbed the design experience of similar foreign projects and combined with the characteristics and operation requirements of this project, so that its arrangement is close and structure rationaI and equipment operation good, which could be used for reference in the design of similar projects
分 类 号:TV34[水利工程—水工结构工程] TV747
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42