机构地区:[1]中国水电顾问集团西北勘测设计研究院,陕西西安710065 [2]甘肃电投炳灵水电开发有限责任公司,甘肃永靖731600
出 处:《水力发电》2009年第1期78-80,共3页Water Power
摘 要:炳灵水电站在国内首次采用将水库泄洪明渠修建在发电站中部的厂房溢流布置模式。电站装有5台48MW的灯泡贯流式机组,机组控制系统的设计有一定的特殊性,对炳灵水电站的调速系统的设计和在设计中采用的特殊措施和实践进行阐述,希望能够为类似电站调速系统的选择和设计提供有益的参考。The overflow approach channel of Bingling hydropower station is located on the mid of the powerhouse, which is the first for such arrangement in China. The Station was equipped with five bulb tubular units, each with the installed capacity of 48 MW. There is certain particularity in the design of control system of generating unit. The paper describes the design of the speed governor system of the Bingling hydropower station and the adopted special measures and experience, which would provide beneficial reference for the selection and design of the speed governor system of similar stations.
分 类 号:TK730.41[交通运输工程—轮机工程] TV747[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117