烧结带冷机烟气余热测试研究  被引量:2

Study on the waste heat of sintering belt cooler

在线阅读下载全文

作  者:陈德敏[1] 陈光[1] 刘长青[2] 

机构地区:[1]安徽工业大学建筑工程学院 [2]马鞍山钢铁股份有限公司

出  处:《冶金能源》2009年第1期61-64,共4页Energy For Metallurgical Industry

摘  要:马钢烧结带冷机废气余热发电系统,有两条烧结冷却生产线的余热回收约60%,还有约40%的热量排空浪费,发电机也远远没有达到它的装机容量。因此,为了定量地将余热利用系统的热能分布明细,明确热量损失原因,对马钢2号烧结机带冷机余热进行了全面测定,提出了提高锅炉效率的措施。Generating system by using waste heat of sintering cooler system were built in Ma Steel. There is about 60% waste heat of tow strips of sintering belt cooler recovery, and about 40% were wasted. The generator failed to reach the installed generating capacity by far. Therefore, in the paper analyses the waste heat distributing in quantitative and makes clear the reasons of the heat loss, and put forward the measures of improving boiler efficiency by the heat test of No. 2 sintering belt cooler.

关 键 词:烧结带冷机 废气余热发电系统 锅炉效率 

分 类 号:TF046.4[冶金工程—冶金物理化学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象