作 者:谢先启[1] 贾永胜[1,2] 罗启军[1] 韩传伟[1] 刘昌邦[1]
机构地区:[1]武汉爆破公司,湖北武汉430023 [2]武汉理工大学资源与环境工程学院,湖北武汉430070
出 处:《爆破》2009年第1期72-74,共3页Blasting
摘 要:介绍了1栋6层砖混结构楼房的单向折叠爆破拆除实例。由于环境限制,必须控制爆堆范围。采用双切口、自上而下延时起爆的单向折叠爆破方案;下部切口布于第1层,上部切口布于第4层,2切口间延时取0.31 s;对非爆楼层的承重墙体进行了预处理;并对保护目标采取了合理的安全保护措施;爆破达到了预期的效果。介绍了爆破参数选择、起爆网路、预处理、安全防护及空心砖墙的钻眼爆破方法等内容,可供类似工程参考。A practical example of successful demolition of 6-floor brick-concrete building by unidirectional folded collapse method was introduced. Because of harsh environment, the muckpile must be controlled . Unidirectional fol-ded method with two blasting cuts and top to down delay ignition network was used. The top cut was designed at 4^th floor,and the down cut was designed at 1^st floor. The delay time between the two cuts is 0.31s. Meanwhile,some bearing wall in non-blasting floors was pretreated and the effective protective measures were used. The result showed that blasting design met the demolition requirement. The blasting parameters, ignition network, pretreatment, protective measures and the treatment method of the wall made of hole-brick are introduced.
分 类 号:TU746.5[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30