摘 要:苏通大桥是目前世界上已建成的最大跨径斜拉桥,其主桥上部结构施工,主要包括边跨辅助跨以及索塔区大块梁段安装,标准梁段安装以及中跨合龙几个阶段。其中大块梁段采用浮吊整体吊装,标准梁段采用桥面双吊机系统进行吊装,中跨合龙采取顶推辅助合龙方法。同时在施工过程中采用了全过程自适应几何控制方法,通过全过程精确控制结构构件的无应力尺寸与形状,以及实现控制系统和被控制系统相适应来达到控制桥梁结构最终线形和内力的目标。为了解决长悬臂主梁风致振动条件下的测量问题,采用了包括基于GPS和基于全站仪的两种动态几何监测系统。对上部结构施工期风致振动进行了深入研究,对最大单、双悬臂状态进行了抖振响应分析,对最大单悬臂状态的主梁抗风安全性进行了分析评估,并提出了相应的抗风措施。成桥状态几何线形误差和索力误差均在设计范围之内。Sutong Yangtze Highway Bridge is the longest span cable-stayed bridge completed in the world nowadays. The construction of superstructure of the main bridge was composed of several stages including erection of big block girders for side span, assistant span and tower area, erection of standard girders and middle span closure. The big block girders were hoisted as integer by floating crane. The standard girders were hoisted by double cranes system at the deck. Pushing assistant method was adopted in middle span closure construction. An all-stage self adaptive geometry control method was used in the construction process. By all-step accurately control to unstressed dimension and shape of all structure components and realization that control system and controlled system adapt to each other, the goal to make the final line shape and inner force of bridge structure under control could be achieved. Two solutions including based GPS and based total station dynamic geometry monitoring systems were used to resolve the measure problem under the condition that wide - range wind-induced vibration with long cantilever state. Finally, the research on wind-induced vibration of super structure during the construction period was executed. Buffeting response analysis to the longest single and double cantilever state were carried out. The analysis and evaluation to wind resistant safety of main girder at the longest single cantilever state were made, and the corresponding wind resistant measures were suggested. As built geometry error and cable force error were controlled in a range design required.
关 键 词:苏通大桥 上部结构 施工方法 施工控制 几何控制 抗风措施
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43