检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东省水利电力勘测设计研究院,广东广州510635
出 处:《水资源与水工程学报》2009年第1期146-149,共4页Journal of Water Resources and Water Engineering
摘 要:增从高速公路垮增江大桥受平面布置和结构技术要求限制,桥墩轴线与水流方向夹角较大。本文用数值模拟的方法对两种桥梁设计方案进行对比研究,通过绘制工程前后的水流流向变化等值线图和流速变化等值线图,分析两种设计方案对河道流场影响的差异,归纳总结出改良方案的优缺点。Restricted by complanate disposal and configuration design of the Zengcong Highway Bridge acoss the Zengjiang River, the angle between the axes of piers and the water flow is bigger. The article uses the method of numerical simulation compared two kinds of design schemes for the bridge. By drawing the isoline figures of flow direction and flow velocity, this paper analyzed the difference between two kinds of design schemes, concluded and summaried the advantages and disadvantages of the perfected schemes.
分 类 号:TV131.4[水利工程—水力学及河流动力学] U44[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15