检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]杭州电子科技大学理学院,浙江杭州310018 [2]浙江科技学院理学院,浙江杭州310023
出 处:《浙江大学学报(理学版)》2009年第2期144-146,152,共4页Journal of Zhejiang University(Science Edition)
基 金:浙江省自然科学基金资助项目(Y606026)
摘 要:讨论两台平行机排序问题.有一台机器在某一个特定时刻可能产生中断,中断持续时间长短满足相应的概率,且工件转移到另一台机器上加工需要考虑运输时间.证明该问题是NP-困难的,设计一个复杂性为O(n3(TP)4)的动态规划算法,调整机器原有的工件排序,使得目标函数为带权重的总完工时间期望值最小.其中,n是工件的个数,TP是所有工件的加工时间之和.Two parallel-machines scheduling problem is considered, in which there is a possibility that a disruption may happen to one of the two parallel machines at a particular time and last for a period of time with a certain probability. The NP-hardness of the problem is proved. A dynamic algorithm is provided, which adjusts the original scheduling and minimizes the expected total weighted completion times, and the complexity is O(n^3(TP)4 ), where n is the number of jobs and TP is the total process time of all the jobs.
分 类 号:O223[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143