高频液压振动锤沉桩的打入性状分析  被引量:15

Penetration behaviour due to vibratory pile driving using the high frequency hydraulic vibratory hammer

在线阅读下载全文

作  者:陈福全[1] 雷金山[2] 汪金卫[1,3] 

机构地区:[1]福州大学土木工程学院,福建福州350108 [2]中南大学土木建筑学院,湖南长沙410075 [3]中国瑞林工程技术有限公司,江西南昌330002

出  处:《铁道科学与工程学报》2009年第1期41-47,共7页Journal of Railway Science and Engineering

基  金:国家自然科学基金资助项目(50778045)

摘  要:采用数值方法对高频液压振动锤沉桩进行轴对称动力分析。在不考虑孔隙水压力情况下模拟沉桩的贯入过程,分析打桩力作用下应力的传播以及在桩体与土层的值与分布,并且考虑对高频振动沉桩影响因素,包括振动锤、桩体、土体的各种参数。The vibratory- driving technique to install piles affected the soil differently than traditional methods such as impact driving. And the shaft resistance of vibratory - driven piles was drastically reduced comparied with impact driven piles. Numerical analysis method was used to research the vibro -driveability without taking into account of pore pressure. Influencing factors were analyzed in details.

关 键 词:高频液压振动锤 振动沉桩 数值分析 

分 类 号:TU443[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象