检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京交通大学土木工程学院,北京100044 [2]哈尔滨铁路局齐齐哈尔科学技术研究所,黑龙江齐齐哈尔161002
出 处:《岩土工程学报》2009年第3期475-479,共5页Chinese Journal of Geotechnical Engineering
基 金:教育部新世纪优秀人才计划项目(NCET-05-0092);国家自然科学基金项目(50678020);铁道部科技研究开发计划项目(2003G033)
摘 要:既有东北铁路牙林线、嫩林线多年冻土区路基病害严重,借鉴青藏铁路建设的成功经验,利用热棒、保温板及保温护道等综合防治措施进行了路基病害整治。针对牙林线北段试验工程,利用观测断面实测地温资料对试验段综合防治措施效果进行分析。分析表明:防治措施效果明显,有效控制了路基下伏多年冻土地温,冻土上限明显抬升,对保证铁路正常运营发挥了积极作用。The roadbed problems of railways are very serious in the permafrost regions of Northeast China. Manifold measures are applied in the experimental project to solve the roadbed problems based on the successful experience of Qinghai-Tibet Railway. There are two sections (274K500 m-275K000 m, 275K460-276K000 m) in the experimental project in the north region of Yaling Railway. Some active measures such as insulated materials (XPS, EPS) and two-phase closed thermosyphons are applied in these two sections. The ground temperature data of long-term monitoring of the experimental project indicate that the measures can effectively reduce the ground temperature of the permafrost under the roadbed and the thickness of the active layer. And the analytic results indicate that the measures are helpful to the stability of railways.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.242.51