机构地区:[1]哈尔滨工业大学土木工程学院,哈尔滨150090 [2]大庆石油学院土木建筑工程学院,大庆163318
出 处:《哈尔滨工业大学学报》2009年第2期43-47,共5页Journal of Harbin Institute of Technology
基 金:教育部新世纪优秀人才支持计划资助项目(教技司[2005]290号);黑龙江省科技攻关资助项目(GC04A609);哈尔滨市科技攻关计划资助项目(2004AA9CS187)
摘 要:针对某综合废水处理厂新建废水处理复合生物池池壁,采用无粘结预应力混凝土结构,给出了池壁在水压力、土压力、温度作用下的内力计算方法,根据最不利荷载组合进行配筋计算及施工过程中池壁混凝土应力验算,在池壁预应力筋施工过程中,环向预应力筋应两端张拉,竖向预应力筋一端张拉,且环向预应力筋和竖向预应力筋张拉应对称进行.To increase the capacity of sewage disposal, a new complex biology tank with its wall adopted an unbonded prestress concrete structure was constructed in a sewage treatment plant. The method to calculate the internal force of the wall under water pressure, soil pressure and temperature was investigated. The reinforcement calculation was carried out based on the worst load combination, and the concrete stress of the wall during the construction was calculated as well. Results indicate that the circular prestressing reinforcement should be pulled oppositely, while the vertical prestressing reinforcement should be Pulled to one end, and the pulling of both reinforcements should be performed symmetrically.
分 类 号:TU532.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229