检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南理工大学测绘与国土信息工程学院,河南焦作454000 [2]葛洲坝集团第五工程有限公司,湖北宜昌443002
出 处:《平顶山工学院学报》2009年第1期58-63,共6页Journal of Pingdingshan Institute of Technology
基 金:河南省重点科技攻关项目(0302032700)
摘 要:在跨V形河谷的大型梁式桥高墩的施工中,墩位测设精度、墩身垂直度及墩顶标高的施工控制难度大。结合双河口特大桥162.658m主墩的施工测量,介绍了大跨度梁桥高墩施工控制测量的方案,以及在工程实际操作中的具体操作方法和注意事项,并讨论了控制技术的合理性。during the construction of high - pier of big bridge which crosses V - shape valley, it is very difficult to get high accuracy in the pier position survey, perpendicular survey and scale height survey, with reference to the construction survey of the shuanghekou big bridge's 162.658 meter leading pier, the paper presents the whole construction survey project of the large span bridge with horizontal beam, and put main emphasis to the method of operation and matters needing attention which will he happen in real practice. Do some analysis about the rationality of the survey project . The experience of the bridge can he offer reference to the construction of other similar kind of long span bridges.
分 类 号:U443.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117