检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《安全与环境工程》2009年第2期93-94,110,共3页Safety and Environmental Engineering
摘 要:针对尾矿库使用后期进行防洪安全分析时,涉及的一个重要的计算参数——主沟槽长度的不同取值方法,对尾矿库防洪安全的影响进行了详细分析,并推荐了一种相对准确的主沟槽长度计算方法。In the flood prevention and safety analysis for the tailing pond at the later stage, the computation of the peak discharge is of the first importance and this involves a very important computation parameter--main trench length. According to the investigation, at present the methods taken by of designing institutes for this parameter are different. This paper gives the detailed analysis of the influence created by different methods of computing the main trench length and recommends one relatively accurate method of main trench yardage calculation.
分 类 号:X936[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171