检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张建强[1] 杨昆[1] 王佩琼[1] 顾煜炯[1] 杨泓
机构地区:[1]华北电力大学能源与动力工程学院,北京市昌平区102206 [2]内蒙古电力公司,内蒙古自治区呼和浩特市010020
出 处:《中国电机工程学报》2009年第10期31-35,共5页Proceedings of the CSEE
摘 要:输电线路因采矿发生杆塔倾斜、位移和倒塌现象屡有发生,采矿引起的地表沉陷与岩体变形不仅是采矿沉陷理论的核心部分,也是采矿区输电线路设计和技术改造的基础。应用数值分析中的有限元方法,建立了计算机仿真分析模型,并提出了一种新的采矿沉陷的预测方法。通过与实测资料的对比,证实了该方法的可行性,并成功应用于内蒙古乌海地区220kV伊临线路的改造工程。The phenomenon of slant, displacement and collapse of poles of transmission lines caused by mining happens frequently, ground subsidence and rock deformation caused by mining are not only the core of the mining subsidence theory, but also the basis of the design and the technological reforming of transmission lines on mining areas. A computer simulation analysis model is built up in this paper applying finite element method on numerical analysis field, and a new mining subsidence prediction method is being proposed. By comparing with the data of the factual measure, it is proved that this method is feasible, and has been successfully used on reforming project of 220 kV Yilin transmission lines at Wuhai Area in Inner Mongolia.
分 类 号:TM752[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222