检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹书波[1]
机构地区:[1]中国民航大学经济与管理学院,天津300300
出 处:《科技资讯》2008年第29期14-14,共1页Science & Technology Information
摘 要:本文介绍了摘挂列车编组钩计划演示系统的设计与开发过程。车辆编组是调车作业过程的重要组成部分,是在编组钩计划的指挥下完成的。为了形象地了解编组钩计划的执行过程以及具体的调车细节,设计开发编组钩计划演示系统就显得非常重要了。本系统主要包括两个模块:原始数据的存储和读取模块以及数据处理模块(即动画实现模块)。This article introduces the hook to pick linked to Train programme presentation system design and development process. Is a grouping of vehicles during the shunting operation an important component of the plan is the hook in the grouping under the command completed. In order to understand the image grouping hook the implementation process and the specific details of the transfer car, hook design and development organization plans presentation systems it is very important. This system mainly consists of two modules:the original data storage and reading of data-processing module and the module (that is, to achieve animation module).
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117