南水北调中线北京段PCCP管道工程进度管理实践  被引量:5

Large-Diameter PCCP Pipeline Construction Progress Control

在线阅读下载全文

作  者:郭晓娜[1] 郭永峰[1] 

机构地区:[1]南水北调中线干线工程建设管理局,北京100053

出  处:《南水北调与水利科技》2009年第2期16-17,28,共3页South-to-North Water Transfers and Water Science & Technology

摘  要:南水北调中线北京段PCCP管道工程是国内首次大规模使用4m直径PCCP的项目,进度控制面临很大的挑战。通过建立进度管理体系、分级制定切实可行的进度计划、实施有效的过程跟踪、抓住关键线路和关键工作、及时分析进度并进行调整、及时研究解决各项重大技术问题等措施,保证了工程顺利完成。PCCP Pipeline Project in Beijing of the Middle Route Project of South to-North Water Diversion is the first large-scale use of 4m diameter PCCP project, progress control faces great challenges. We adopted the following measures to ensure the project successful completion such as to establish schedule management system grade and formulate practical progress schedule, to make effectively follow-up process, to seize the key lines of work, to analyze progress timely and to adjust accordingly, to study and solve major technical problems.

关 键 词:南水北调中线 PCCP 管道工程 进度管理 实践 

分 类 号:TU991.36[建筑科学—市政工程] TV68[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象