机构地区:[1]华东宜兴抽水蓄能有限公司,江苏宜兴214205
出 处:《水力发电》2009年第2期45-48,共4页Water Power
摘 要:在工程建设与厂矿生产中对新技术、新材料、新工艺和新设备的发明、创造和使用一般统称为"四新技术"的应用。江苏宜兴抽水蓄能电站工程所处地理环境的限制和影响,为工程设计和施工增加了许多新课题和难点,自宜兴抽水蓄能电站工程项目筹建以来,业主单位与设计、科研、施工等单位做了大量研究和试验工作,通过多次论证,在水工设计、施工、环保等方面采用了许多新技术、新材料、新工艺和新设备,不少项目属国内外首次应用。It's generally regarded as the application of the "Four-New Technology", which is new technology, new material, new technique, new equipment, to have them invented, created and used sequentially in the process of project construction and plant mining. Restricted and influenced by its geographic location, Jiangsu Yixing Pumped Storage Power Station Project has encountered additional variations and difficulties in the project design and construction. Since the project was prepared, huge amount of studies and tests have been made by the Company together with designers, scientific research institutes, construction units. Through several verifications, many new technologies, materials, workmanships and equipments were adopted in the hydraulic design, construction and environmental protection, among which a lot are of its first use at home and abroad.
关 键 词:新技术 新材料 新工艺 新设备 江苏宜兴抽水蓄能电站
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.106.12