25MW汽轮发电机实现孤厂运行的措施  被引量:1

Measures to Realize Operation of 25 MW Turbine Generator in an Isolated Power Plant

在线阅读下载全文

作  者:王新娣[1] 李传纪[1] 林佑祥[1] 李增光[1] 关彦华[1] 

机构地区:[1]莱芜钢铁集团有限公司热电厂,山东莱芜271104

出  处:《冶金动力》2009年第2期37-39,42,共4页Metallurgical Power

摘  要:总结了莱钢股份热电厂3#25 MW汽轮发电机孤立网运行技术改造经验,为自备电厂实现发电机孤立网运行控制拓宽了思路,更为下一步实现热电厂两台12 MW汽轮发电机、一台25 MW汽轮发电机孤立网运行改造提供了技术经验。The technical reconstruction experience of operation of No.3 25 MW turbine generator in an isolated electric network of the Heat Power Plant of Laiwu Iron & Steel Group Co., Ltd was summarized. It broadened thought to realize operation control of generator in the isolated electric network for the industrial power plant. It also provided experience for realizing running reconstruction of two 12 MW turbine generators and one 25 MW turbine generator in isolated electric network.

关 键 词:汽轮发电机 孤立网运行 措施 

分 类 号:TM311[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象